Return To Gallery Menu
 
Daylighting of Arion Tunnel
Posted to History of the Peavine Railroad Facebook Group By Chad Fannin, January 17, 2020. Comments from post.

Here is a photo of a N&W work train nearing the completion of daylighting Arion tunnel on the Peavine. It’s been noted that the daylighting process took over a year to complete in order to cause little delay in train service as possible. The first train to run through the daylight tunnel was noted as July 29, 1903. This photo is probably taken a short time before that date. 21 years before at this same location, the local newspapers reported that in June 1882, workers for the Cincinnati & Eastern RR were building the tunnel when a fuse going to a black powder charge failed to set it off. James Shanley and James Grace both went to drill it out when it exploded, horribly mangling both of them. Shanly, 25 years of age, had both eyeballs blown out of his head along with his arm ripped off and the other arm being broken. Grace received severe injuries but remarkable they both survived this event.
 
Location: Arion, OH Date: 1/1/1903
Source: Chad Fannin Personal Collection
Photo ID: 2091
Photo Link: Click Here To See Original
Categories: Daylighted Tunnel |  Maintenance |  People | 
Quick Link Menu | Home

Western Ohio Story
    Concept
    History
    System Map

Peavine Division Layout
    About the Peavine Layout
    Track Plan
    Guiding Principles
    Engine Roster
    Industries
Other Layouts
    Marien Switching District
    Offal, IN Branch

Influences and Inspirations
    Favorite Layouts

How Do
    Paperwork
The Real Peavine
    About the Peavine
    Prototype Industries
    1987 Inspection Trip
    1965 Timetable

Photo and Video Galleries
    Prototype Gallery
    Peavine Gallery
       Walk The Line
    Model Gallery
About
    Owner: David Lamb
    Contact the WO
    About The Site
    About The Home Page
 
Copyright 2013 - 2024